New production line for gummies

  • Location Granby, QC
  • Project cost 30M$
  • Year of achievement 2022

DESCRIPTION

The goal was to expand the client production capability for gummies. A plant expansion
has been necessary and all the required services have been designed.

  • Relocation of several lines and equipment
  • Kitchen system, molding, packaging
  • CIP washing system
  • Packaging lines
  • Refrigeration, electricity, steam, drinking water, etc.

OFFERED SERVICES

  • Pre-engineering and project estimation
  • Bidding and supplier selection process
  • Development of requirements for professionals other than Sogenix (Architecture, buildings, services, etc.)
  • 3D layout drawing of the complete line
  • Process design, P&ID, drainage plan, plans and specifications
  • Electrical engineering, automation architecture
  • PLC and HMI programming
  • Supervision of the work
  • Project management and coordination
  • Start-up and commissioning