Industrial warehouse densification

  • Localisation Quebec
  • Project cost 500,000$
  • Year of achievement 2019

DESCRIPTION

The project consisted of designing and implementing a high-density storage system to optimize space utilization and increase storage capacity.

The mandate included integrating a high-density racking system and implementing an automated FIFO pallet management system.

The system was designed to ensure efficient finished goods management while improving traceability and inventory turnover.

Particular attention was given to equipment integration and optimization of logistics operations within an existing environment.

This project stands out for implementing a densified storage solution that significantly increases capacity without building expansion.

This industrial warehouse densification enables optimized pallet flow management and improved operational performance.

SCOPE OF SERVICES

  • Specifications and performance criteria
  • Needs analysis and storage system design
  • Supplier selection and qualification
  • Support for the tendering process
  • Construction supervision and commissioning

KEY PROJECT CHALLENGES

  • Maximize storage capacity without expansion
  • Integration of a high-density system in an existing building
  • Implementation of automated FIFO management
  • Coordination of material handling and storage equipment
  • Maintaining operations during implementation